Inta Bina Group Berhad
0192 · Main Market主板(Main Market) · annual reports 2023 to 2025, 719 entries read2023 至 2025 年报,共读出 719 条
The company这家公司
Inta Bina Group Berhad is a building contractor operating solely in Malaysia. Its subsidiaries secure and carry out construction contracts, develop property through Angkasa Senuri Sdn. Bhd., and provide lift and escalator installation and maintenance through IBEE Sdn. Bhd.Inta Bina Group Berhad 是一家仅在马来西亚运营的建筑承包商。其子公司承接并执行建筑合约,通过 Angkasa Senuri Sdn. Bhd. 开展房产开发,并通过 IBEE Sdn. Bhd. 提供电梯和自动扶梯的安装与保养业务。
Sources (5)出处(5)
Inta Bina Sdn. Bhd. 100 100 Securing and carrying out construction contracts
Angkasa Senuri Sdn. Bhd. 100 100 Property development, investment and management
IBEE Sdn. Bhd. 55 55 Carrying out construction and engineering service to supply, install and maintain elevators, escalators, and dumbwaiter lifts
The Group operates solely in Malaysia.
The Group has also expanded its capabilities beyond core construction into property development and selected specialist contracting activities, including through its IBEE business.
In 2025, construction contracts contributed RM647,362,353 of external revenue, property development contributed RM91,939,303, and lift installation and maintenance contributed RM11,260,779, out of total revenue of RM750,562,435. In 2023, residential projects represented 77.3% of revenue and non-residential projects 21.3%.2025 年,建筑合约在 RM750,562,435 的总营业额中贡献了 RM647,362,353 的对外营业额,房产开发贡献了 RM91,939,303,电梯安装与保养贡献了 RM11,260,779。而在 2023 年,住宅项目占营业额的 77.3%,非住宅项目占 21.3%。
Sources (5)出处(5)
The Group’s revenue are generated mainly from residential projects which contributed 77.3% to the total revenue and 21.3% from non-residential projects.
Construction contracts 647,362,353 639,770,219 - -
Property development 91,939,303 45,141,209 - -
Lift installation and maintenance 11,260,779 5,848,346 - -
External revenue 647,362,353 91,939,303 11,260,779 - 750,562,435
The group undertakes projects for developers including Sime Darby Property, Mah Sing, Tropicana and Gamuda. At the end of 2025, the group reported an outstanding construction order book of RM1.69 billion, compared to RM1.0 billion at the end of 2023 and RM1.5 billion at the end of 2024.集团为包括 Sime Darby Property、Mah Sing、Tropicana 和 Gamuda 在内的开发商承建项目。截至 2025 年底,集团的未完成建筑订单为 RM1.69 billion,而在 2023 年底为 RM1.0 billion,2024 年底为 RM1.5 billion。
Sources (7)出处(7)
Our unbilled order book, currently at a healthy RM1.0 billion, will provide us with earnings visibility over the coming years.
UNBILLED ORDER BOOK RM1.5 bil FYE2023: RM1.0 bil
As at the end of the financial year, the Group maintained an outstanding construction order book of RM1.69 billion (approximately 2.2 times annual revenue), largely driven by projects from established developers.
Sime Darby Property Berhad P184 1 block of 34-storey apartments (234 units) at Seksyen 1 Bandar Ulu Kelang, Gombak 93.7 601.2
Mah Sing Group Berhad P187 2 blocks of 33-storey apartments, block A (500 units) & block B (499 units) at Southville City, Sepang 206.0 206.0
Tropicana Corporation Berhad P193 1 block of 38-storey serviced apartments (553 units) at Taman Tropicana Metropark, Subang Jaya 224.8 224.8
Gamuda Berhad (Gamuda Land) P194 174 units semi-detached at Gamuda Cove, Kuala Langat 112.0 112.0
Apexjaya Industries Sdn Bhd held 171,911,900 shares (27.56%) in the 2025 report. Lim Ooi Joo held 51,958,050 shares (8.33%) directly and was deemed interested in 172,028,700 shares (27.58%) through Apexjaya and his son Lim Yeong Kern. Ahmad Bin Awi held 50,292,600 shares (8.06%) and Teo Hock Choon held 48,882,850 shares (7.84%). The report describes Lim Ooi Joo and Teo Hock Choon as directors and substantial shareholders of the group and of Apexjaya Industries Sdn Bhd.在 2025 年年报中,Apexjaya Industries Sdn Bhd 持有 171,911,900 股(27.56%)。Lim Ooi Joo 直接持有 51,958,050 股(8.33%),并通过 Apexjaya 及其儿子 Lim Yeong Kern 被视作持有 172,028,700 股(27.58%)的权益。Ahmad Bin Awi 持有 50,292,600 股(8.06%),Teo Hock Choon 持有 48,882,850 股(7.84%)。年报称 Lim Ooi Joo 与 Teo Hock Choon 为集团及 Apexjaya Industries Sdn Bhd 的董事兼大股东。
Sources (6)出处(6)
Lim Ooi Joo and Teo Hock Choon are both Directors and Substantial Shareholders of IBGB Group and Apexjaya Industries Sdn Bhd respectively.
1. APEXJAYA INDUSTRIES SDN BHD 171,911,900 27.56 - -
2. AHMAD BIN AWI 50,292,600 8.06 - -
3. LIM OOI JOO 51,958,050 8.33 172,028,700 (a) 27.58
4. TEO HOCK CHOON 48,882,850 7.84 - -
(a) Deemed interested by virtue of his interest in Apexjaya Industries Sdn Bhd pursuant to Section 8(4) of the Companies Act 2016 (“Act”) and his son, Lim Yeong Kern’s direct shareholding in the Company pursuant to Section 59(11) of the Act.
The group pays construction-related costs to Apexjaya Industries Sdn Bhd, amounting to RM10,762,955 in 2023, RM12,147,952 in 2024, and RM13,262,049 in 2025. The 2025 related party transactions also list RM82,500 with Lim Yeong Kern, son of Lim Ooi Joo, who was appointed a director on 27 March 2025.集团向 Apexjaya Industries Sdn Bhd 支付建筑相关费用,2023 年为 RM10,762,955,2024 年为 RM12,147,952,2025 年为 RM13,262,049。2025 年关联方交易亦列出与 Lim Yeong Kern(Lim Ooi Joo 之子)的 RM82,500 交易,他于 2025 年 3 月 27 日获委任为董事。
Sources (5)出处(5)
Apexjaya Industries Sdn Bhd is a Substantial Shareholder of Inta Bina Group Berhad. 10,762,955
Construction related cost charged by a substantial corporate shareholder 12,147,952 10,762,955 - -
Apexjaya Industries Sdn Bhd is a Substantial Shareholder of Inta Bina Group Berhad. 13,262,049
Lim Yeong Kern is the son of Lim Ooi Joo, a Director and Substantial Shareholder of Inta Bina Group Berhad. 82,500
Lim Yeong Kern (Appointed on 27 March 2025)
External revenue by segment, 20252025 年各分部对外营业额
Sources (1)出处(1)
External revenue 647,362,353 91,939,303 11,260,779 - 750,562,435
Major events大事记
Sources (1)出处(1)
On 26 January 2022, Inta Bina Group Berhad (“IBGB”) and Lagenda Properties Berhad (“LPB”) entered into a joint venture agreement to set up a joint venture 50:50 basis known as Lagenda Inta Sdn. Bhd. (“LISB”).
Sources (3)出处(3)
SEIRING SETIA SDN BHD Registration No. 202301003514 (1497433-M) (Acquired on 10 March 2023)
On 30 November 2023, the Company subscribed for 137,500 ordinary shares in IBEE Sdn. Bhd. (“IBEE”) for a total cash consideration of RM137,500.
On 10 March 2023, the Company subscribed for 1 ordinary share in Seiring Setia Sdn. Bhd. (“SSSB”) for a total cash consideration of RM1, representing 100% equity interest in SSSB.
Sources (2)出处(2)
On 5 December 2024, SSSB entered into a Sale and Purchase Agreement ("SPA") with QL Agrifoods Sdn Bhd (formerly known as QL Feedingstuffs Sdn. Bhd.) for the purchase of a vacant freehold land for a total cash consideration of RM23,000,000.
As at financial year ended 31 December 2024, the purchase is pending completion with a RM2,300,000 deposit paid.
Sources (2)出处(2)
On 28 May 2025, the Company completed the issuance of 55,320,000 new ordinary shares, representing 10% of the total number of issued shares (“Placement Shares”) at an issue price of RM0.4794 per share (“Private Placement”).
On 21 March 2025, the Company acquired 100% equity interest (representing 2,000,000 ordinary shares) in Aliran Restu Sdn. Bhd. for a total cash consideration of RM5,000,000.
Revenue, profit and operating cash营业额、利润与营运现金
Assets, borrowings and equity资产、借款与权益
20232023 年
In 2023, net cash from operating activities was RM65,587,338. Investing activities used RM13,717,914, including RM9,861,472 for property, plant and equipment and RM2,666,471 for investment property. Financing activities used RM28,739,986; short-term borrowing repayments of RM291,659,310 exceeded drawdowns of RM264,969,326, and there were drawings of RM6,000,000 in term loans and RM4,127,492 in Islamic term financing. Dividend payments took RM6,700,787.2023 年,营运活动所得现金净额为 RM65,587,338。投资活动使用了 RM13,717,914,其中包括 RM9,861,472 用于物业、厂房及设备,以及 RM2,666,471 用于投资物业。融资活动使用了 RM28,739,986;偿还短期借款 RM291,659,310 多于新提取的 RM264,969,326,另提取了 RM6,000,000 定期贷款和 RM4,127,492 伊斯兰定期融资。股息支付支出了 RM6,700,787。
Sources (9)出处(9)
Purchase of property, plant and equipment (Note a) (9,861,472) (4,675,187) - -
Purchase of investment property (2,666,471) (5,877,381) - -
Net cash flows (used in)/from investing activities (13,717,914) (14,013,144) 4,767,054 (9,758,644)
Dividend paid (6,700,787) (5,352,587) (6,700,787) (5,352,587)
Drawdown of term loan 6,000,000 - - -
Drawdown of Islamic term financing 4,127,492 - - -
Drawdown of short-term borrowings 264,969,326 200,584,964 - -
Repayment of short-term borrowings (291,659,310) (160,144,411) - -
Net cash flows (used in)/from financing activities (28,739,986) 29,610,508 (11,304,582) 5,816,271
20242024 年
In 2024, operating activities used net cash of RM2,802,717, which the group stated was mainly due to higher recognition of contract assets. Investing activities used RM25,235,176, including RM14,264,174 for property, plant and equipment and RM14,091,510 in additional pledged deposits. Financing activities generated net cash of RM26,537,047. Drawdowns included RM43,755,595 of short-term borrowings and RM20,458,970 of bridging loans, while repayments included RM13,605,426 of bridging loans and RM6,998,408 of term loans. Proceeds from the exercise of ESOS were RM3,291,300, and dividends paid were RM13,724,725.2024 年,营运活动使用了现金净额 RM2,802,717,集团说明主要由于合约资产确认增加。投资活动使用了 RM25,235,176,其中包括 RM14,264,174 用于物业、厂房及设备,以及 RM14,091,510 的新增质押存款。融资活动产生现金净额 RM26,537,047。提取款项包括短期借款 RM43,755,595 和过桥贷款 RM20,458,970;偿还款项包括过桥贷款 RM13,605,426 与定期贷款 RM6,998,408。行使雇员认股计划所得款项为 RM3,291,300,已付股息为 RM13,724,725。
Sources (11)出处(11)
This is mainly due to higher recognition of contract assets contributing to significant cash inflow in the upcoming year.
Change in pledged deposits (14,091,510) (3,530,740) - -
Purchase of property,plant and equipment (Note a) (14,264,174) (9,861,472) - -
Net cash flows (used in)/from investing activities (25,235,176) (13,717,914) 3,418,138 4,767,054
Dividend paid (13,724,725) (6,700,787) (13,724,725) (6,700,787)
Drawdown of short-term borrowings 43,755,595 264,969,326 - -
Drawdown of bridging loan 20,458,970 - - -
Repayment of term loans (6,998,408) (304,323) - -
Repayment of bridging loan (13,605,426) - - -
Proceeds from exercise of ESOS 3,291,300 352,800 4,586,041 352,800
Net cash flows from/(used in) financing activities 26,537,047 (28,739,986) (18,099,509) (11,304,582)
20252025 年
In 2025, operating activities generated net cash of RM23,850,973. Investing activities used RM47,842,961, which included RM31,358,326 to purchase property, plant and equipment, RM23,000,000 for land held for property development, and RM4,999,449 for acquisition of assets, offset by RM4,502,633 from released pledged deposits and RM3,369,787 from asset disposals. Financing activities provided RM23,871,155. Inflows included RM26,520,408 from the issuance of shares pursuant to private placement and RM23,238,800 from Islamic term financing drawdowns, while bridging loan repayments took RM6,853,544 and dividends paid took RM12,292,520.2025 年,营运活动产生现金净额 RM23,850,973。投资活动使用了 RM47,842,961,其中包括 RM31,358,326 购买物业、厂房及设备,RM23,000,000 用于持作房产开发土地,以及 RM4,999,449 用于收购资产,被质押存款解冻收回 RM4,502,633 和资产出售收入 RM3,369,787 所部分抵销。融资活动带来 RM23,871,155。流入款项包括根据私下配售发行股份所得 RM26,520,408 以及伊斯兰定期融资提取 RM23,238,800,而过桥贷款偿还支出了 RM6,853,544,已付股息支出 RM12,292,520。
Sources (11)出处(11)
Change in pledged deposits 4,502,633 (14,091,510) - -
Acquisition of assets, net of cash acquired (Note 8(b)) (4,999,449) - - -
Purchase of property, plant and equipment (Note a) (31,358,326) (14,264,174) - -
Purchase of land held for property development (23,000,000) - - -
Proceeds from disposal of property, plant and equipment 3,369,787 1,606,000 - -
Net cash flows (used in)/from investing activities (47,842,961) (25,235,176) (7,044,803) 4,712,877
Dividend paid (12,292,520) (13,724,725) (12,292,520) (13,724,725)
Issuance of shares pursuant to private placement 26,520,408 - 26,520,408 -
Drawdown of Islamic term financing 23,238,800 2,902,908 - -
Repayment of bridging loan (6,853,544) (13,605,426) - -
Net cash flows from/(used in) financing activities 23,871,155 26,537,047 (29,928,710) (19,394,248)
Across the three years三年合看
Across the three years, loans and borrowings moved from RM66.5 million in 2023 to RM112.6 million in 2024 and RM129.9 million in 2025, with gross gearing ratios of 0.39 times, 0.58 times and 0.52 times. The group noted that operations have become more capital-intensive compared to prior periods. Unbilled construction order book rose from RM1.0 billion in 2023 to RM1.5 billion in 2024 and RM1.69 billion in 2025. Dividends declared per ordinary share were 1.5 sen in 2023, 2.0 sen in 2024 and 2.5 sen in 2025.三年合看,贷款及借款从 2023 年的 RM66.5 million 增至 2024 年的 RM112.6 million 和 2025 年的 RM129.9 million,总负债比率分别为 0.39 倍、0.58 倍和 0.52 倍。集团指出,与往期相比,其业务变得更加资本密集。未完成建筑订单从 2023 年的 RM1.0 billion 增至 2024 年的 RM1.5 billion 和 2025 年的 RM1.69 billion。每股普通股宣布派发的股息分别为 2023 年 1.5 仙、2024 年 2.0 仙和 2025 年 2.5 仙。
Sources (12)出处(12)
Our unbilled order book, currently at a healthy RM1.0 billion, will provide us with earnings visibility over the coming years.
For FYE 2023, the Group has declared a total of 1.5 sen per ordinary share, with a total dividend payout RM8.1 million during the reporting year.
Gross gearing ratio 0.39 0.57
UNBILLED ORDER BOOK RM1.5 bil FYE2023: RM1.0 bil
Loans and borrowings rose from RM66.5 million at the end of the previous year to RM112.6 million as of 31 December 2024, driven by increased financing for ongoing projects and working capital needs.
The Group’s gross gearing ratio has increased to 0.58 times from 0.39 times in the preceding financial year.
For FYE 2024, the Group has declared a total of 2.0 sen per ordinary share, with a total dividend payout of RM11.0 million for the reporting year.
As at the end of the financial year, the Group maintained an outstanding construction order book of RM1.69 billion (approximately 2.2 times annual revenue), largely driven by projects from established developers.
On the funding side, total borrowings rose to RM129.9 million (2024: RM112.6 million), while total equity increased to RM251.2 million (2024: RM193.6 million), supported by retained earnings and a private placement completed during the year.
While gearing remains at a manageable level, the Group’s operations are becoming more capital-intensive compared to prior periods.
During the financial year, the Group declared 2.5 sen dividends (2024: 2.0 sen), taking into account its financial performance, working capital requirements and ongoing investments in development activities.
Gross gearing ratio 0.52 0.58
Still to be spent尚未支出的承诺
Proceeds of approximately RM26.5 million from the private placement completed on 28 May 2025 were fully utilised for capital expenditure, working capital and private placement expenses. For ongoing contracts, remaining performance obligations at the end of 2025 stood at RM1.69 billion for construction, expected over the next 12 to 36 months, and RM0.03 billion for property development over the next 12 months.2025 年 5 月 28 日完成的私下配售所得款项约 RM26.5 million 已在年内悉数动用于资本支出、营运资金及私下配售费用。在在建合约方面,截至 2025 年底剩余履约义务为:建筑合约 RM1.69 billion,预计在未来 12 至 36 个月内履行;房产开发 RM0.03 billion,预计在未来 12 个月内履行。
Sources (7)出处(7)
Financing activities included additional borrowings, as well as proceeds of approximately RM26.5 million from a private placement completed on 28 May 2025.
On 28 May 2025, the Company completed the issuance of 55,320,000 new ordinary shares, representing 10% of the total number of issued shares (“Placement Shares”) at an issue price of RM0.4794 per share (“Private Placement”).
Capital expenditure 12,000 (12,000) - Within 12 months
Working capital 14,430 (14,430) - Within 24 months
Private placement expenses 90 (90) - Upon completion
(i) RM1.69 billion (2024: RM1.54 billion) and the Group will recognise this revenue as the construction are completed, which is expected to occur over the next 12 to 36 months (2024: 12 to 36 months); and
(ii) RM0.03 billion (2024: RM0.13 billion) and the Group will recognise this revenue as the properties are completed, which is over the next 12 months (2024: 24 months).
Four years of figures四年数字
Group figures, in RM, as printed in the statements.集团数字,单位令吉,照财务报表所印。
| Group集团 | 2022 | 2023 | 2024 | 2025 |
|---|---|---|---|---|
| RM令吉 | RM令吉 | RM令吉 | RM令吉 | |
| Revenue营业额 | 466,273,446 | 650,107,369 | 690,759,774 | 750,562,435 |
| Profit before tax税前利润 | 13,671,385 | 31,813,281 | 43,474,467 | 55,569,371 |
| Profit for the financial year本财政年度利润 | 9,558,010 | 22,886,406 | 33,136,611 | 40,516,903 |
| Net cash flows from/(used in) operating activities营运活动所得/(所用)现金流量净额 | (8,632,962) | 65,587,338 | (2,802,717) | 23,850,973 |
| Purchase of property, plant and equipment购买物业、厂房及设备 | (4,675,187) | (9,861,472) | (14,264,174) | (31,358,326) |
| Dividend paid已付股息 | (5,352,587) | (6,700,787) | (13,724,725) | (12,292,520) |
| Total assets总资产 | 425,719,881 | 509,269,192 | 621,576,239 | 715,801,705 |
| Loans and borrowings贷款及借款 | 86,773,670 | 66,470,801 | 112,648,019 | 129,905,896 |
| Cash and bank balances现金及银行结余 | 30,744,968 | 48,228,888 | 53,937,055 | 52,223,435 |
| Total equity总权益 | 152,321,904 | 169,547,490 | 193,567,105 | 251,181,168 |
On a computer, hover over a figure for the report and page it is printed on.在电脑上把鼠标移到数字上,可看到它印在哪份年报的哪一页。
Said and done说过的与做到的
| What the reports said年报说要做的 | What later reports show之后年报显示的 | Status状态 |
|---|---|---|
| Expected the construction sector to continue to expand the order book in 2024 (2023)预计 2024 年建筑板块将继续拓展订单簿(2023) | The group secured 6 new projects with contract value totalling RM1.2 billion in 2024, expanding the unbilled order book to RM1.5 billion.集团在 2024 年获得了 6 个新项目,合约总额为 RM1.2 billion,未完成订单增至 RM1.5 billion。Sources (4)出处(4)For 2024, we expect the construction sector to continue to expand our order book. UNBILLED ORDER BOOK RM1.5 bil FYE2023: RM1.0 bil A positive demand for the Group’s construction expertise and activities in 2024 culminated with the securing of 6 new projects with contract value totalling RM1.2 billion. Currently, the new order book for FYE 2024 stands at RM1.2 billion. | Carried out已执行 |
| Seiring Setia to acquire vacant freehold land for RM23,000,000 under an agreement of 5 December 2024, pending completion at end 2024 (2024)Seiring Setia 根据 2024 年 12 月 5 日的协议以 RM23,000,000 收购永久地契空置土地,截至 2024 年底待完成(2024) | The 2025 cash flow shows RM23,000,000 paid for land held for property development, and the 2025 property list shows freehold land for future development at RM23,000,000.2025 年现金流量表显示为持作房产开发土地支付 RM23,000,000,2025 年产业清单列有作未来开发的永久地契土地 RM23,000,000。Sources (6)出处(6)On 5 December 2024, SSSB entered into a Sale and Purchase Agreement ("SPA") with QL Agrifoods Sdn Bhd (formerly known as QL Feedingstuffs Sdn. Bhd.) for the purchase of a vacant freehold land for a total cash consideration of RM23,000,000. As at financial year ended 31 December 2024, the purchase is pending completion with a RM2,300,000 deposit paid. The balance purchase price is payable within 5 months from the SPA date, with allowable 1 month extension period. Purchase of land held for property development (23,000,000) - - - - Freehold land 23,000,000 - Land for future development Freehold - RM23,000,000 31.12.2025 | Paid; land listed已付款;土地已列入 |
| Proposed a private placement of up to 10% of issued shares to finance capital expenditure and project needs (2024)计划进行不超过已发行股份 10% 的私下配售,以筹集资本支出及项目所需资金(2024) | Completed the issuance of 55,320,000 new ordinary shares at RM0.4794 per share on 28 May 2025, with proceeds of approximately RM26.5 million.于 2025 年 5 月 28 日以每股 RM0.4794 完成发行 55,320,000 股新普通股,所得款项约为 RM26.5 million。Sources (5)出处(5)On 27 February 2025, the Company had announced to undertake a proposed private placement of up to 10% of the total number of issued shares (“Placement Shares”) at an issue price to be determined and announced later (“Proposed Private Placement”). On 14 March 2025, the Company announced that Bursa Securities, vide its letter dated 14 March 2025 had approved the listing and quotation of new ordinary shares to be issued pursuant to the private placement. The Proposed Private Placement is undertaken with the intention to raise proceeds to finance the capital expenditure of the Group as well as ongoing and future construction and property development projects. Financing activities included additional borrowings, as well as proceeds of approximately RM26.5 million from a private placement completed on 28 May 2025. On 28 May 2025, the Company completed the issuance of 55,320,000 new ordinary shares, representing 10% of the total number of issued shares (“Placement Shares”) at an issue price of RM0.4794 per share (“Private Placement”). | Completed已完成 |
What the reports leave open年报留下待看的事
- A total of 124,814,095 warrants with an exercise price of RM0.40 remain outstanding, set to expire on 18 July 2026.共有 124,814,095 份行权价为 RM0.40 的凭单尚未行权,将于 2026 年 7 月 18 日到期。
Sources (3)出处(3)
Each Warrants entitles the registered holder the right at any time during the exercise period from 19 July 2021 to 18 July 2026 to subscribe for one (1) new ordinary share at the exercise price of RM0.40 each.
Number of Warrants Issued : 124,814,095 Warrants 2021/2026 (“Warrant A”)
Expiry Date of Warrants : 18/07/2026
- A total of 31,443,000 share options under the ESOS remain outstanding, with the scheme expiring on 24 November 2026.雇员认股计划下尚有 31,443,000 份购股权未行权,该计划将于 2026 年 11 月 24 日期满。
Sources (2)出处(2)
The ESOS of the Company was implemented on 25 November 2021 and shall be in force for a period of 5 years which will expire on 24 November 2026.
Total options outstanding 31,443,000 16,890,000
- Trade receivables and contract assets stood at RM300.29 million and RM121.97 million, with RM39,459,988 of trade receivables overdue past 90 days.贸易应收账款与合约资产达 RM300.29 million 与 RM121.97 million,其中超过 90 天的逾期应收账款为 RM39,459,988。
Sources (2)出处(2)
> 90 days past due 39,459,988 - 39,459,988
As at 31 December 2025, the Group’s trade receivables and contract assets amounted to RM300.29 million and RM121.97 million respectively.
- The group deployed RM28.0 million for land and development rights for upcoming property development projects at Seiring Setia in Bukit Jelutong and Aliran Restu.集团为 Bukit Jelutong 的 Seiring Setia 以及 Aliran Restu 等后续房产开发项目投入了 RM28.0 million 的土地与开发权资金。
Sources (3)出处(3)
On the development front, following the completion of Senuri Residences, the Group is progressing plans for Seiring Setia in Bukit Jelutong as part of its ongoing development pipeline.
Non-current assets increased to RM130.3 million (2024: RM73.7 million), mainly due to the acquisition of development land and a subsidiary with development rights amounting to RM28.0 million.
This forms part of the Group’s investment in its upcoming Seiring Setia and Aliran Restu project, with capital deployed upfront and value to be realised progressively over the development cycle.
Facts as printed in the company's annual reports, with the page of each; no rating and no advice. Built 2026-10-17.内容为公司年报所印的事实,并注明页码;不评级,不构成投资建议。生成日期 2026-10-17。