DailySpaceBursa Malaysia companies, read from their annual reports从年报读懂大马上市公司

Kinergy Advancement Berhad

0193 · Main Market主板 · annual reports 2023 to 2025, 717 entries read2023 至 2025 年报,共读出 717 条

Revenue, 20252025 年营业额RM478.3m4.78亿令吉up 95.4% from比 2024 年增加 95.4%,当年为 RM244.8m2.45亿令吉 in 2024
Profit for the financial year, 20252025 年年度盈利RM27.7m2.77千万令吉up 26.0% from比 2024 年增加 26.0%,当年为 RM22.0m2.20千万令吉 in 2024
Total borrowings, 20252025 年总借款RM246.3m2.46亿令吉up 35.4% from比 2024 年增加 35.4%,当年为 RM181.9m1.82亿令吉 in 2024
Total equity, 20252025 年总权益RM272.1m2.72亿令吉up 3.1% from比 2024 年增加 3.1%,当年为 RM264.0m2.64亿令吉 in 2024

The company这家公司

Kinergy Advancement Berhad provides sustainable energy solutions and engineering services. Bursa Malaysia confirmed its sector reclassification into Renewable Energy under the Energy sector on 13 January 2025, and recognised the company under its corporate identity Kinergy on 30 December 2025.Kinergy Advancement Berhad提供可持续能源方案与工程服务。马来西亚交易所于 2025 年 1 月 13 日确认将其行业重新分类至能源板块下的可再生能源领域,并于 2025 年 12 月 30 日在公司新标识 Kinergy 下予以认可。

Source: annual report 2024, page 4; annual report 2025, pages 7, 20.出处:2024 年年报第 4 页;2025 年年报第 7、20 页。

In 2025, the Sustainable Energy Solutions segment contributed RM328.2 million (69% of revenue), while engineering contributed RM148.7 million. Malaysia accounted for RM464.1 million of revenue, Indonesia RM11.4 million, and Thailand RM1.6 million. Revenue from three major customers amounted to RM323,286,000.2025 年,可持续能源方案部门贡献营业额 RM328.2 million(占营业额 69%),工程部门贡献 RM148.7 million。马来西亚占营业额 RM464.1 million,印度尼西亚占 RM11.4 million,泰国占 RM1.6 million。来自三名主要客户的营业额合计 RM323,286,000。

Source: annual report 2025, pages 20, 29, 107, 112.出处:2025 年年报第 20、29、107、112 页。

Dato’ Lai Keng Onn held 357,625,525 shares (16.37%) directly and had deemed interest in 218,400,000 shares (10.00%) held through Fastrans Venture Sdn. Bhd., Stocqtech Sdn. Bhd. and VDone Legacy Ventures Sdn. Bhd. Dato’ Gan Kong Hiok held 234,640,948 shares (10.739%). Pledged securities accounts held these blocks: Affin Hwang Nominees for Dato’ Lai Keng Onn held 174,653,366 shares (7.99%), RHB Nominees for Dato’ Gan Kong Hiok held 165,373,948 shares (7.57%), MBSB Investment Nominees for Stocqtech Sdn. Bhd. held 83,333,334 shares (3.81%), and Alliancegroup Nominees for Dato’ Lai Keng Onn held 48,627,897 shares (2.23%).Dato’ Lai Keng Onn 直接持有 357,625,525 股(16.37%),并通过 Fastrans Venture Sdn. Bhd.、Stocqtech Sdn. Bhd. 与 VDone Legacy Ventures Sdn. Bhd. 视同持有 218,400,000 股(10.00%)。Dato’ Gan Kong Hiok 持有 234,640,948 股(10.739%)。多个质押证券账户持有以下股份:Affin Hwang Nominees 质押账户(Dato’ Lai Keng Onn)持有 174,653,366 股(7.99%),RHB Nominees 质押账户(Dato’ Gan Kong Hiok)持有 165,373,948 股(7.57%),MBSB Investment Nominees 质押账户(Stocqtech Sdn. Bhd.)持有 83,333,334 股(3.81%),以及 Alliancegroup Nominees 质押账户(Dato’ Lai Keng Onn)持有 48,627,897 股(2.23%)。

Source: annual report 2025, pages 131, 132.出处:2025 年年报第 131、132 页。

Dato’ Lai Keng Onn, the Executive Deputy Chairman cum Group Managing Director, is the spouse of Datin Alicia Chan Pey Kheng, the Executive Director and Group Chief Operating Officer. Datin Alicia Chan held 14,363,709 shares (0.66%). Their daughters Lai Reiko and Lai Yiew Kwan, Jessie serve in senior management. On the Board, Goh Kok Boon resigned as Executive Director on 6 March 2024. Datuk Wira Mubarak Hussain bin Akhtar Husin was appointed Non-Independent Non-Executive Director on 29 April 2024 and resigned on 24 October 2025. Dato’ Seri Nazir Hussin bin Akhtar Hussin was appointed on 15 July 2025, and Choong Gaik Seng resigned on the same day.执行副主席兼集团董事经理 Dato’ Lai Keng Onn 是执行董事兼集团首席营运官 Datin Alicia Chan Pey Kheng 的配偶。Datin Alicia Chan 持有 14,363,709 股(0.66%)。其女儿 Lai Reiko 与 Lai Yiew Kwan, Jessie 担任高级管理职务。在董事会方面,Goh Kok Boon 于 2024 年 3 月 6 日辞任执行董事。Datuk Wira Mubarak Hussain bin Akhtar Husin 于 2024 年 4 月 29 日获委任为非独立非执行董事,并于 2025 年 10 月 24 日辞任。Dato’ Seri Nazir Hussin bin Akhtar Hussin 于 2025 年 7 月 15 日获委任,Choong Gaik Seng 于同日辞任。

Source: annual report 2023, page 33; annual report 2024, page 25; annual report 2025, pages 8, 11, 16, 17, 61, 132.出处:2023 年年报第 33 页;2024 年年报第 25 页;2025 年年报第 8、11、16、17、61、132 页。

External revenue by segment, 20252025 年各部门外部营业额

Sustainable Energy Solutions: 68.6%Engineering: 31.1%Other: 0.3%
Sustainable Energy Solutions 68.6%可持续能源方案 68.6%Engineering 31.1%工程 31.1%Other 0.3%其他 0.3%

Source: annual report 2025, page 111.出处:2025 年年报第 111 页。

Major events大事记

2023On 9 February 2023, signed a share purchase agreement to acquire a 10.0% stake in Sipitang Utilities Sdn. Bhd.2023 年 2 月 9 日,签署股份买卖协议以收购 Sipitang Utilities Sdn. Bhd. 的 10.0% 股权。

Source: annual report 2023, page 17.出处:2023 年年报第 17 页。

2023On 21 June 2023, acquired 100% of Matahari Suria Sdn. Bhd. for RM3,514,007, and on 27 August 2023 completed the acquisition of PT Inpola Mitra Elektrindo for RM10,000.2023 年 6 月 21 日,以 RM3,514,007 收购 Matahari Suria Sdn. Bhd. 的 100% 股权;2023 年 8 月 27 日,以 RM10,000 完成收购 PT Inpola Mitra Elektrindo。

Source: annual report 2023, pages 71, 91.出处:2023 年年报第 71、91 页。

2023On 5 October 2023, issued 137,121,212 placement shares at RM0.33 per share.2023 年 10 月 5 日,按每股 RM0.33 发行 137,121,212 股配售股份。

Source: annual report 2023, page 42.出处:2023 年年报第 42 页。

2024845,902,607 unexercised warrants lapsed on 29 April 2024 and were removed from the Main Market of Bursa Malaysia on 30 April 2024.845,902,607 份未行使凭单于 2024 年 4 月 29 日失效,并于 2024 年 4 月 30 日从马来西亚交易所主板除牌。

Source: annual report 2024, page 63.出处:2024 年年报第 63 页。

2024On 19 June 2024, acquired 100% of Tunjang Tenaga Sdn. Bhd. for RM200.2024 年 6 月 19 日,以 RM200 收购 Tunjang Tenaga Sdn. Bhd. 的 100% 股权。

Source: annual report 2024, page 85.出处:2024 年年报第 85 页。

2024In December 2024, issued 61,266,000 placement shares at RM0.3250 and 31,096,000 placement shares at RM0.3300.2024 年 12 月,按每股 RM0.3250 发行 61,266,000 股配售股份,并按每股 RM0.3300 发行 31,096,000 股配售股份。

Source: annual report 2024, page 58.出处:2024 年年报第 58 页。

2025On 13 January 2025, Bursa Malaysia reclassified the company into Renewable Energy under the Energy sector.2025 年 1 月 13 日,马来西亚交易所将公司重新分类至能源板块下的可再生能源领域。

Source: annual report 2025, page 7.出处:2025 年年报第 7 页。

2025Acquired 100% of Jati Cakerawala Sdn. Bhd. for a total purchase consideration of MYR47.85 million, starting with 47.5% for RM35,000,000 on 6 May 2025.收购 Jati Cakerawala Sdn. Bhd. 的 100% 股权,总收购对价为 MYR47.85 million,其中于 2025 年 5 月 6 日以 RM35,000,000 收购初步 47.5%。

Source: annual report 2025, pages 8, 80, 100.出处:2025 年年报第 8、80、100 页。

2025On 30 December 2025, Bursa Malaysia recognised the company under its ticker name Kinergy.2025 年 12 月 30 日,马来西亚交易所认可公司的新代号名称 Kinergy。

Source: annual report 2025, page 41.出处:2025 年年报第 41 页。

2026In January 2026, broke ground on the 120 MW power plant in Labuan and agreed to divest 49% of Jati Cakerawala Sdn. Bhd. for RM41,521,000.2026 年 1 月,纳闽 120 MW 发电厂项目动工,并同意以 RM41,521,000 出售 Jati Cakerawala Sdn. Bhd. 的 49% 股权。

Source: annual report 2025, pages 26, 31, 125.出处:2025 年年报第 26、31、125 页。

Revenue and profit营业额与盈利

Revenue营业额
2022
RM187.0m1.87亿令吉
2023
RM199.3m1.99亿令吉
2024
RM244.8m2.45亿令吉
2025
RM478.3m4.78亿令吉
Profit before taxation税前盈利
2022
RM4.92m492万令吉
2023
RM29.2m2.92千万令吉
2024
RM28.3m2.83千万令吉
2025
RM39.3m3.93千万令吉
Profit for the financial year年度盈利
2022
RM2.79m279万令吉
2023
RM27.6m2.76千万令吉
2024
RM22.0m2.20千万令吉
2025
RM27.7m2.77千万令吉

Assets, borrowings and equity资产、借款与权益

Total assets总资产
2022
RM286.9m2.87亿令吉
2023
RM435.8m4.36亿令吉
2024
RM500.4m5.00亿令吉
2025
RM705.7m7.06亿令吉
Total borrowings总借款
2022
RM77.6m7.76千万令吉
2023
RM125.7m1.26亿令吉
2024
RM181.9m1.82亿令吉
2025
RM246.3m2.46亿令吉
Total equity总权益
2022
RM137.0m1.37亿令吉
2023
RM212.0m2.12亿令吉
2024
RM264.0m2.64亿令吉
2025
RM272.1m2.72亿令吉

20232023 年

Operating activities generated net cash of RM1.8 million. Private placement of shares brought RM45.2 million. Term loans provided drawdowns of RM49.5 million, while repayments took RM10.3 million for term loans, RM20.0 million for medium term notes, and RM37.4 million for other borrowings. Purchase of property, plant and equipment took RM12.8 million. Net cash outflow on acquisition of subsidiaries was RM5.5 million; the group acquired Matahari Suria Sdn. Bhd. for RM3,514,007 and PT Inpola Mitra Elektrindo for RM10,000. A bargain purchase gain of RM22.8 million was recognised. Pledged fixed deposits increased by RM2.8 million.营运活动产生净现金 RM1.8 million。配售股份筹得 RM45.2 million。提取定期贷款 RM49.5 million,而偿还定期贷款耗资 RM10.3 million,偿还中期票据耗资 RM20.0 million,偿还其他借款耗资 RM37.4 million。购买物业、厂房及设备耗资 RM12.8 million。收购子公司的净现金流出为 RM5.5 million;集团以 RM3,514,007 收购 Matahari Suria Sdn. Bhd.,并以 RM10,000 收购 PT Inpola Mitra Elektrindo。另确认了 RM22.8 million 的廉价收购收益。抵押定期存款增加 RM2.8 million。

Source: annual report 2023, pages 52, 53, 71.出处:2023 年年报第 52、53、71 页。

20242024 年

Operating activities used net cash of RM87.7 million. Financing came from private placement share proceeds of RM45.9 million, term loan drawdowns of RM67.7 million, and net proceeds from other borrowings of RM21.5 million. Repayment of term loans used RM27.4 million, and pledged fixed deposits increased by RM16.6 million. Investing activities included RM4.2 million for purchase of plant and equipment and RM2.1 million for other investments. The group acquired Tunjang Tenaga Sdn. Bhd. for RM200. Finalisation of purchase price allocation reduced property, plant and equipment by RM17.6 million and retained profits by RM15.6 million.营运活动使用净现金 RM87.7 million。融资来自私募配售股份所得 RM45.9 million、定期贷款提取 RM67.7 million 以及其他借款所得净额 RM21.5 million。偿还定期贷款耗资 RM27.4 million,抵押定期存款增加 RM16.6 million。投资活动包括用于购买厂房及设备的 RM4.2 million 以及用于其他投资的 RM2.1 million。集团以 RM200 收购了 Tunjang Tenaga Sdn. Bhd.。收购价格分摊的敲定使物业、厂房及设备减少 RM17.6 million,保留盈利减少 RM15.6 million。

Source: annual report 2024, pages 71, 85, 110.出处:2024 年年报第 71、85、110 页。

20252025 年

Operating activities used net cash of RM12.1 million. Net cash outflow on acquisition of subsidiaries was RM46.5 million, with Jati Cakerawala Sdn. Bhd. acquired for a total purchase consideration of MYR47.85 million in tranches of RM35,000,000, RM5,505,000 and RM7,340,000. Investing activities also received RM12.2 million in dividends from a joint venture, while purchase of plant and equipment used RM2.9 million and other investments used RM9.8 million. Financing cash flows included term loan drawdowns of RM84.9 million and private placement proceeds of RM35.1 million, while term loan repayments took RM14.0 million and pledged deposits increased by RM15.4 million.营运活动使用净现金 RM12.1 million。收购子公司的净现金流出为 RM46.5 million,其中收购 Jati Cakerawala Sdn. Bhd. 的总对价为 MYR47.85 million,分批支付 RM35,000,000、RM5,505,000 及 RM7,340,000。投资活动还收到合营企业股息 RM12.2 million,购买厂房及设备支出 RM2.9 million,其他投资支出 RM9.8 million。融资现金流包括提取定期贷款 RM84.9 million 及私募配售所得 RM35.1 million,而偿还定期贷款耗资 RM14.0 million,抵押存款增加 RM15.4 million。

Source: annual report 2025, pages 80, 86, 100.出处:2025 年年报第 80、86、100 页。

Across the three years三年合看

Across the three years, total borrowings increased from RM77.6 million in 2022 to RM125.7 million in 2023, RM181.9 million in 2024, and RM246.3 million in 2025. Operating cash flow shifted from positive RM1.8 million in 2023 to negative RM87.7 million in 2024 and negative RM12.1 million in 2025. Private placements raised RM60.95 million under the 2022 placement and RM65.2 million under the 2024 placement. The 2025 report restated 2024 results, turning profit of RM22.0 million into a loss of RM1.4 million and reducing revenue by RM24.8 million to RM220.0 million; the adjustments listed include measurement period adjustments of RM19.1 million. No dividend was recommended or paid across the three years.三年合看,总借款从 2022 年的 RM77.6 million 增加至 2023 年的 RM125.7 million、2024 年的 RM181.9 million 及 2025 年的 RM246.3 million。营运现金流从 2023 年的正 RM1.8 million 转为 2024 年的负 RM87.7 million 及 2025 年的负 RM12.1 million。2022 年配售筹得 RM60.95 million,2024 年配售筹得 RM65.2 million。2025 年年报重述了 2024 年业绩,将 RM22.0 million 的盈利修正为 RM1.4 million 的亏损,营业额减少 RM24.8 million 至 RM220.0 million;所列调整包括 RM19.1 million 的计量期调整。三年内未建议亦未派发股息。

Source: annual report 2023, pages 15, 44; annual report 2024, page 62; annual report 2025, pages 29, 39, 76, 119, 123.出处:2023 年年报第 15、44 页;2024 年年报第 62 页;2025 年年报第 29、39、76、119、123 页。

Still to be spent尚未支出的承诺

At end-2025, RM32.0 million remained unutilised from the 2024 private placement proceeds allocated for renewable energy projects, out of RM65.2 million raised. In addition, an equipment supply agreement was signed on 9 January 2026 for one gas turbine and one generator.截至 2025 年底,在 2024 年私募配售所筹集的 RM65.2 million 中,尚有 RM32.0 million 分配给可再生能源项目的资金未动用。此外,集团于 2026 年 1 月 9 日签署了一台燃气轮机和一台发电机的设备供应协议。

Source: annual report 2025, pages 29, 31, 73.出处:2025 年年报第 29、31、73 页。

Four years of figures四年数字

Group figures, in RM thousand (×1,000), as printed in the statements.集团数字,单位千令吉(×1,000),照财务报表所印。

Group集团2022202320242025
RM'000千令吉RM'000千令吉RM'000千令吉RM'000千令吉
Revenue营业额187,002199,314244,768478,293
Profit before taxation税前盈利4,91729,15428,33539,255
Profit for the financial year年度盈利2,78927,59121,99127,705
Net cash from/(used in) operating activities营运活动所得/(所用)现金净额2,8751,827(87,655)(12,140)
Purchase of plant and equipment购买厂房与设备(8,624)(12,785)(4,216)(2,886)
Proceeds from issuance of new shares发行新股所得9,78845,25045,87335,070
Total assets总资产286,918435,814500,447705,682
Total borrowings总借款77,555125,744181,853246,274
Cash and bank balances现金与银行结余12,65323,08425,20049,017
Total equity总权益137,017212,020264,017272,131

On a computer, hover over a figure for the report and page it is printed on.在电脑上把鼠标移到数字上,可看到它印在哪份年报的哪一页。

Said and done说过的与做到的

What the reports said年报说要做的What later reports show之后年报显示的Status状态
Targeted increasing energy production capacity to 29.7MW starting from 2024预期从 2024 年起将能源产能提升至 29.7MWBy 2025, SES capacity was recorded at 31.0 MW.到 2025 年,可持续能源方案产能记录为 31.0 MW。

Source: annual report 2023, page 15; annual report 2025, page 48.出处:2023 年年报第 15 页;2025 年年报第 48 页。

Exceeded said capacity超过所述产能
Targeted completion of the gas engine power plant at Sipitang in 2026以 2026 年完成实必丹燃气发动机发电厂为目标The project, co-developed with PETRONAS as a 72 MW plant, was scheduled for completion in Q3 2026.该项目作为与 PETRONAS 共同开发的 72 MW 发电厂,计划于 2026 年第三季度完工。

Source: annual report 2023, page 14; annual report 2024, page 23; annual report 2025, page 23.出处:2023 年年报第 14 页;2024 年年报第 23 页;2025 年年报第 23 页。

Not yet complete; still scheduled for Q3 2026尚未完成;仍计划于 2026 年第三季度完工
Proposed to acquire 100% of Tunjang Tenaga Sdn. Bhd. for RM200拟以 RM200 收购 Tunjang Tenaga Sdn. Bhd. 的 100% 股权On 19 June 2024, acquired 100% of Tunjang Tenaga Sdn. Bhd. for RM200.2024 年 6 月 19 日,以 RM200 完成收购 Tunjang Tenaga Sdn. Bhd. 的 100% 股权。

Source: annual report 2023, page 91; annual report 2024, page 85.出处:2023 年年报第 91 页;2024 年年报第 85 页。

Completed已完成
Proposed to acquire a 47.5% equity stake in Jati Cakerawala Sdn. Bhd. for MYR35 million拟以 MYR35 million 收购 Jati Cakerawala Sdn. Bhd. 的 47.5% 股权Acquired the initial 47.5% on 6 May 2025 for RM35,000,000, then secured 100% for a total purchase consideration of MYR47.85 million.于 2025 年 5 月 6 日以 RM35,000,000 收购初步 47.5% 股权,随后以 MYR47.85 million 总收购对价取得 100% 股权。

Source: annual report 2024, pages 4, 111; annual report 2025, pages 31, 80, 100.出处:2024 年年报第 4、111 页;2025 年年报第 31、80、100 页。

Completed and expanded已完成并扩大
Aimed to complete the 2024 private placement of up to 106,272,288 remaining shares under an extension to 18 July 2025目标是在延长至 2025 年 7 月 18 日的期限内完成 2024 年私募配售所余最多 106,272,288 股股份Issued 48,454,500 shares on 18 April 2025 and 57,817,788 shares on 15 August 2025 under a further extension to 18 October 2025.在进一步延长至 2025 年 10 月 18 日的期限内,于 2025 年 4 月 18 日发行 48,454,500 股,并于 2025 年 8 月 15 日发行 57,817,788 股。

Source: annual report 2024, page 121; annual report 2025, page 73.出处:2024 年年报第 121 页;2025 年年报第 73 页。

Completed under further extension在进一步延期下完成
Set targets to reduce Scope 1 and Scope 2 emissions by 42% by 2030 and 90% by 2050 from a 2021 baseline设定目标在 2021 年基准上于 2030 年减少范围 1 和范围 2 排放 42%,2050 年减少 90%Targets were maintained in the 2024 and 2025 reports.该目标在 2024 年与 2025 年年报中均予维持。

Source: annual report 2023, page 15; annual report 2024, page 26; annual report 2025, page 33.出处:2023 年年报第 15 页;2024 年年报第 26 页;2025 年年报第 33 页。

Maintained维持不变

What the reports leave open年报留下待看的事

  • Construction of the 120 MW power plant in Labuan under an MYR646.3 million EPCC contract, which broke ground on 27 January 2026 and is targeted for commercial operations by December 2027.纳闽 120 MW 发电厂工程的建设进展,该项目合同价值 MYR646.3 million,于 2026 年 1 月 27 日动工,目标在 2027 年 12 月投入商业营运。

    Source: annual report 2025, pages 23, 26, 31.出处:2025 年年报第 23、26、31 页。

  • Whether the group moves ahead with a gas-fired power plant in Perlis with an intended capacity of up to 1.5 GW, which it said it would explore. The group completed the sale of a 49% stake in Jati Cakerawala Sdn. Bhd. for RM41,521,000 on 27 January 2026.集团是否推进玻璃市一座目标产能最高达 1.5 GW 的燃气发电厂,集团称将探讨此项目。集团已于 2026 年 1 月 27 日完成以 RM41,521,000 出售 Jati Cakerawala Sdn. Bhd. 49% 股权。

    Source: annual report 2025, pages 26, 27, 125.出处:2025 年年报第 26、27、125 页。

  • Utilisation of the remaining RM32.0 million of proceeds from the 2024 private placement allocated for renewable energy projects within 36 months.2024 年私募配售所筹资金中分配给可再生能源项目的剩余 RM32.0 million 资金在 36 个月内的动用情况。

    Source: annual report 2025, page 73.出处:2025 年年报第 73 页。

  • Short-term debt refinancing, with total borrowings at RM246.3 million of which RM130.5 million is due on demand or within one year, against pledged bank deposits of RM68.3 million.短期债务再融资情况,总借款为 RM246.3 million,其中 RM130.5 million 须于按要求或一年内偿还,而抵押银行存款为 RM68.3 million。

    Source: annual report 2025, pages 105, 106.出处:2025 年年报第 105、106 页。

Facts as printed in the company's annual reports, with the page of each; no rating and no advice. Built 2026-10-24.内容为公司年报所印的事实,并注明页码;不评级,不构成投资建议。生成日期 2026-10-24。