DailySpaceBursa Malaysia companies, read from their annual reports从年报读懂大马上市公司

Southern Cable Group Berhad

0225 · Main Market主板(Main Market) · annual reports 2023 to 2025, 394 entries read2023 至 2025 年报,共读出 394 条

Revenue, 20252025 年营业额RM1,759.7m17.60亿令吉up 30.6% from比 2024 年增加 30.6%,当年为 RM1,347.0m13.47亿令吉 in 2024
Profit for the financial year, 20252025 年财政年度盈利RM131.4m1.31亿令吉up 81.7% from比 2024 年增加 81.7%,当年为 RM72.3m7.23千万令吉 in 2024
Total assets, 20252025 年总资产RM1,152.8m11.53亿令吉up 59.8% from比 2024 年增加 59.8%,当年为 RM721.2m7.21亿令吉 in 2024
Loans and borrowings, 20252025 年贷款与借款RM235.7m2.36亿令吉up 9.2% from比 2024 年增加 9.2%,当年为 RM215.7m2.16亿令吉 in 2024

The company这家公司

Southern Cable manufactures cables and wires, as well as plastic compounds, with its main manufacturing facility in Kuala Ketil, Kedah. It is a registered supplier with Tenaga Nasional Berhad, Sabah Electricity, Sarawak Energy, and PETRONAS, and holds category G7 registration with the Construction Industry Development Board of Malaysia.Southern Cable 制造电缆与电线以及塑料混配料,主要制造基地设于吉打州瓜拉吉底。公司是国家能源、沙巴电力、砂拉越能源及国家石油的注册供应商,并持有马来西亚建筑工业发展局(CIDB)的 G7 级别注册。

Sources (4)出处(4)
Manufacture of plastic compounds
Annual report 2023, page 52023 年年报,第 5 页
Southern Cable invested in new machinery to increase the annual cable and wire production capacity by 21% to 40,780 km, from 33,780 km previously, at the manufacturing facility in Kuala Ketil, Kedah.
Annual report 2023, page 92023 年年报,第 9 页
We are a registered supplier with Tenaga Nasional Berhad (TNB), Sabah Electricity Sdn. Bhd., Sarawak Energy Berhad, and PETRONAS;
Annual report 2024, page 112024 年年报,第 11 页
Our registration with the Construction Industry Development Board of Malaysia (CIDB) under category G7 allows the Group to bid for projects of unlimited value in Malaysia.
Annual report 2025, page 112025 年年报,第 11 页

Power cables and wires are the largest revenue contributor, generating RM910.7 million in 2023, RM1.22 billion in 2024, and RM1.62 billion in 2025. In 2025, control and instrumentation cables and wires contributed RM43.2 million, other related products and services RM94.1 million, and communication cables and wires RM2.5 million.电力电缆与电线是最大的营业额来源,2023 年贡献 RM910.7 million,2024 年为 RM1.22 billion,2025 年为 RM1.62 billion。2025 年,控制与仪表电缆电线贡献 RM43.2 million,其他相关产品与服务贡献 RM94.1 million,通讯电缆与电线贡献 RM2.5 million。

Sources (3)出处(3)
Revenue from external customers 910,703,174 8,988,562 29,650,848 103,738,516 - 1,053,081,100
Annual report 2023, page 1262023 年年报,第 126 页
Revenue from external customers 1,224,092,746 4,059,153 27,186,269 91,677,683 - 1,347,015,851
Annual report 2024, page 1472024 年年报,第 147 页
Revenue from external customers 1,619,848,465 2,508,066 43,176,538 94,121,448 - 1,759,654,517
Annual report 2025, page 1532025 年年报,第 153 页

Domestic sales made up RM1.02 billion in 2023, RM1.28 billion in 2024, and RM1.53 billion in 2025. Overseas revenue rose from RM31.7 million in 2023 and RM65.9 million in 2024 to RM233.8 million in 2025, including over RM160 million in sales to a US customer. In 2025, two customers accounted for approximately RM563.5 million of total group revenue, compared to one customer accounting for RM313.3 million in 2024 and RM202.7 million in 2023.国内销售额在 2023 年为 RM1.02 billion,2024 年为 RM1.28 billion,2025 年为 RM1.53 billion。海外营业额由 2023 年的 RM31.7 million 和 2024 年的 RM65.9 million 增至 2025 年的 RM233.8 million,包括对一名美国客户超过 RM160 million 的销售。2025 年,两名客户占集团总营业额约 RM563.5 million,而 2024 年一名客户占 RM313.3 million,2023 年一名客户占 RM202.7 million。

Sources (10)出处(10)
Local 1,021,335,033 99,578,802
Annual report 2023, page 1282023 年年报,第 128 页
Overseas 31,746,067 -
Annual report 2023, page 1282023 年年报,第 128 页
For power cables and wires, communication cables and wires and control and instrumentation cables and wires, revenue from one customer represented approximately RM202,748,235 (2022: RM211,107,803) of the Group’s total revenue.
Annual report 2023, page 1282023 年年报,第 128 页
Local 1,281,138,132 138,286,160
Annual report 2024, page 1492024 年年报,第 149 页
Overseas 65,877,719 -
Annual report 2024, page 1492024 年年报,第 149 页
For power cables and wires, communication cables and wires and control and instrumentation cables and wires, revenue from one customer represented approximately RM313,341,715 (2023: RM202,748,235) of the Group’s total revenue.
Annual report 2024, page 1492024 年年报,第 149 页
The higher exports translated to over RM160 million in sales to a US customer, up from the RM40 million recorded in the previous year.
Annual report 2025, page 132025 年年报,第 13 页
Local 1,525,855,953 318,629,846
Annual report 2025, page 1552025 年年报,第 155 页
Overseas 233,798,564 -
Annual report 2025, page 1552025 年年报,第 155 页
For power cables and wires, communication cables and wires and control and instrumentation cables and wires, revenue from two(2) (2024: one(1)) customers represented approximately RM563,517,739 (2024: RM313,341,715) of the Group’s total revenue.
Annual report 2025, page 1552025 年年报,第 155 页

Sino Shield Sdn. Bhd. is the largest shareholder with 314,524,412 shares (27.82%), followed by the Employees Provident Fund Board with 106,701,300 shares (9.44%). Mdm. Ooi Gaik Bee is deemed interested in 316,624,412 shares (28.00%) via Sino Shield Sdn. Bhd. and the direct shareholdings of her spouse Mr. Tung Eng Hai. Mr. Tung Eng Hai is the brother-in-law of Director Mr. Wong Meng Kee.Sino Shield Sdn. Bhd. 是最大股东,持有 314,524,412 股(27.82%),其次是雇员公积金局,持有 106,701,300 股(9.44%)。Mdm. Ooi Gaik Bee 通过 Sino Shield Sdn. Bhd. 及其配偶 Tung Eng Hai 的直接持股被视为拥有 316,624,412 股(28.00%)权益。Tung Eng Hai 是董事 Wong Meng Kee 的姻亲兄弟。

Sources (6)出处(6)
a) Mr. Tung Eng Hai is the spouse of Mdm. Ooi Gaik Bee, the major shareholder of the Company.
Annual report 2025, page 702025 年年报,第 70 页
b) Mr. Tung Eng Hai is the brother-in-law of Mr. Wong Meng Kee, a Director of the Company.
Annual report 2025, page 702025 年年报,第 70 页
Sino Shield Sdn. Bhd. 314,524,412 27.82 - -
Annual report 2025, page 1632025 年年报,第 163 页
Employees Provident Fund Board 106,701,300 9.44 - -
Annual report 2025, page 1632025 年年报,第 163 页
Ooi Gaik Bee - - 316,624,412(2) 28.00
Annual report 2025, page 1632025 年年报,第 163 页
(2) Deemed interested by virtue of her shareholdings in Sino Shield Sdn. Bhd. pursuant to Section 8(4) of the Companies Act 2016, and her spouse, Tung Eng Hai’s direct shareholdings in the Company.
Annual report 2025, page 1632025 年年报,第 163 页

Semangat Handal Sdn. Bhd. held 128,028,400 shares (15.99%) in 2023 and 72,028,400 shares (7.80%) in 2024. In 2023 the list of top holders included a pledged securities account for Chin Chin Seong with 30,175,300 shares (3.77%). In February 2026, Ms. Fawiza Binti Faiz and Mr. Wong Kar Wai concluded their tenures as Non-Independent Non-Executive Directors.Semangat Handal Sdn. Bhd. 在 2023 年持有 128,028,400 股(15.99%),2024 年持有 72,028,400 股(7.80%)。2023 年的前列股东名单中有 Chin Chin Seong 的质押证券账户,持有 30,175,300 股(3.77%)。2026 年 2 月,Fawiza Binti Faiz 与 Wong Kar Wai 结束了非独立非执行董事的任期。

Sources (4)出处(4)
Semangat Handal Sdn. Bhd. (“Semangat”) 128,028,400 15.99 - -
Annual report 2023, page 1342023 年年报,第 134 页
Pledged Securities Account for Chin Chin Seong 30,175,300 3.77
Annual report 2023, page 1352023 年年报,第 135 页
Semangat Handal Sdn. Bhd. 72,028,400 7.80 - -
Annual report 2024, page 1552024 年年报,第 155 页
I also wish to record our appreciation to Ms. Fawiza Binti Faiz and Mr. Wong Kar Wai, who concluded their tenures as Non-Independent Non-Executive Directors in February 2026.
Annual report 2025, page 102025 年年报,第 10 页

Revenue by product segment, 20252025 年各产品部门营业额

Power cables and wires: 92.1%Other related products and services: 5.3%Control and instrumentation cables and wires: 2.5%Communication cables and wires: 0.1%
Power cables and wires 92.1%电力电缆与电线 92.1%Other related products and services 5.3%其他相关产品与服务 5.3%Control and instrumentation cables and wires 2.5%控制与仪表电缆电线 2.5%Communication cables and wires 0.1%通讯电缆与电线 0.1%
Sources (1)出处(1)
Revenue from external customers 1,619,848,465 2,508,066 43,176,538 94,121,448 - 1,759,654,517
Annual report 2025, page 1532025 年年报,第 153 页

Major events大事记

2022Bonus issued 400,000,000 warrants on 1 November 2022 on the basis of 1 warrant for every 2 existing ordinary shares held.2022 年 11 月 1 日按每持有 2 股现有普通股获配 1 份凭单的基准红利配发 400,000,000 份凭单。
Sources (1)出处(1)
On 1 November 2022, the Company bonus issued 400,000,000 warrants on the basis of 1 warrant for every 2 existing ordinary shares held in the Company.
Annual report 2023, page 752023 年年报,第 75 页
2023Invested RM6.3 million in new machinery to expand annual cable and wire production capacity to 40,780 km from 33,780 km.投资 RM6.3 million 购置新机械,将电缆与电线年产能从 33,780 km 提高至 40,780 km。
Sources (1)出处(1)
The Group in FYE2023 has executed expansion plans by investing RM6.3 million in new machinery to enlarge the annual production of our existing cable and wire facility in Kuala Ketil, Kedah, increasing by 21% to 40,780 km from 33,780 km previously.
Annual report 2023, page 122023 年年报,第 12 页
2023Extended the timeframe for utilising initial listing proceeds for capital expenditure by 24 months to 15 October 2025.将首次上市所得款项用于资本支出的期限延长 24 个月至 2025 年 10 月 15 日。
Sources (2)出处(2)
The Board of Directors of the Company had on 23 October 2023 resolved to extend the timeframe for the utilisation of proceeds raised from the Listing Proceeds for capital expenditure and expansion for another 24 months period until 15
Annual report 2023, page 712023 年年报,第 71 页
the extension of the timeframe for the utilisation of proceeds raised from the Listing Proceeds for capital expenditure and expansion for another 24 months period until 15 October 2025, allowing the Company to have additional time to utilise the remaining balance of the Listing Proceeds.
Annual report 2024, page 952024 年年报,第 95 页
2024Acquired a 7.9-acre industrial land with an existing building adjacent to facilities in Kuala Ketil for RM14.0 million in May 2024.2024 年 5 月以 RM14.0 million 收购位于瓜拉吉底现有厂房相邻的 7.9 英亩工业用地及现有建筑物。
Sources (1)出处(1)
In May 2024, Southern Cable acquired a 7.9-acre industrial land with an existing building adjacent to our current facilities in Kuala Ketil, Kedah, for RM14.0 million.
Annual report 2024, page 92024 年年报,第 9 页
2024Secured UL Standard certification for USE-2 aluminium building wire in December 2024.2024 年 12 月取得 USE-2 铝制建筑电线的 UL 标准认证。
Sources (1)出处(1)
In December 2024, we secured a new UL Standard certification for the USE-2 aluminium building wire, and we aim to begin shipments to the US in the first half of 2025.
Annual report 2024, page 132024 年年报,第 13 页
2025Completed the first tranche of a private placement on 24 November 2025, with 102,378,500 shares listed at RM1.99 per share; the placement raised RM203.7 million.2025 年 11 月 24 日完成私下配售第一批,102,378,500 股配售股份以每股 RM1.99 上市;此次配售筹得 RM203.7 million。
Sources (2)出处(2)
To fund our next phase of growth, we successfully raised RM203.7 million through a private placement exercise in October 2025.
Annual report 2025, page 92025 年年报,第 9 页
The first tranche of the Private Placement exercise was completed on 24 November 2025, following the listing of and quotation for 102,378,500 Placement Shares at an issue price of RM1.99 per share on the Main Market of Bursa Malaysia Securities Berhad (“Bursa Securities”).
Annual report 2025, page 962025 年年报,第 96 页
2025Secured a supply agreement for underground cables and conductors for Tenaga Nasional Berhad amounting to RM403.6 million.获得国家能源(TNB)配电网地下电缆及导线供应协议,金额达 RM403.6 million。
Sources (1)出处(1)
We continued to win significant orders in 2025, most notably a supply agreement for underground cables and conductors for Tenaga Nasional Berhad’s (TNB) distribution network amounting to RM403.6 million.
Annual report 2025, page 92025 年年报,第 9 页

Revenue, profit and operating cash营业额、盈利与营运现金

Revenue营业额
2022
RM875.9m8.76亿令吉
2023
RM1,053.1m10.53亿令吉
2024
RM1,347.0m13.47亿令吉
2025
RM1,759.7m17.60亿令吉
Profit for the financial year财政年度盈利
2022
RM14.5m1.45千万令吉
2023
RM29.4m2.94千万令吉
2024
RM72.3m7.23千万令吉
2025
RM131.4m1.31亿令吉
Net cash from operating activities营运活动所得现金净额
2022
–RM41.3m–4.13千万令吉
2023
RM123.0m1.23亿令吉
2024
RM11.1m1.11千万令吉
2025
RM10.1m1.01千万令吉

Assets, borrowings and equity资产、借款与权益

Total assets总资产
2022
RM570.5m5.71亿令吉
2023
RM605.6m6.06亿令吉
2024
RM721.2m7.21亿令吉
2025
RM1,152.8m11.53亿令吉
Loans and borrowings贷款与借款
2022
RM217.7m2.18亿令吉
2023
RM195.7m1.96亿令吉
2024
RM215.7m2.16亿令吉
2025
RM235.7m2.36亿令吉
Total equity总权益
2022
RM287.8m2.88亿令吉
2023
RM315.0m3.15亿令吉
2024
RM401.8m4.02亿令吉
2025
RM751.0m7.51亿令吉

20232023 年

In 2023, net cash from operating activities was RM123.0 million. Cash used in investing activities included purchase of property, plant and equipment of RM7.8 million. Financing cash outflows included bankers' acceptance net repayment of RM26.8 million (drawdown of RM709.2 million against repayment of RM736.0 million), interest paid of RM9.0 million, and dividends paid of RM2.2 million. Total loans and borrowings stood at RM195.7 million, including bankers' acceptance of RM181.8 million.2023 年,营运活动所得现金净额为 RM123.0 million。投资活动所用现金包括购买物业、厂房及设备 RM7.8 million。融资现金流出包括银行承兑汇票净偿还 RM26.8 million(提取 RM709.2 million,偿还 RM736.0 million)、已付利息 RM9.0 million 及已付股息 RM2.2 million。贷款与借款总额为 RM195.7 million,其中银行承兑汇票为 RM181.8 million。

Sources (8)出处(8)
Purchase of property, plant and equipment (A) (7,808,334) (12,412,925) - -
Annual report 2023, page 852023 年年报,第 85 页
Interest paid (8,965,789) (8,037,449) - -
Annual report 2023, page 852023 年年报,第 85 页
Dividends paid (2,240,000) (1,680,000) (2,240,000) (1,680,000)
Annual report 2023, page 852023 年年报,第 85 页
Drawdown of bankers’ acceptance 709,237,490 873,251,062 - -
Annual report 2023, page 852023 年年报,第 85 页
Repayment of bankers’ acceptance (736,019,968) (819,270,794) - -
Annual report 2023, page 852023 年年报,第 85 页
Bankers’ acceptance 208,566,186 (26,782,478) - 181,783,708
Annual report 2023, page 862023 年年报,第 86 页
Bankers’ acceptance (e) 181,783,708 208,566,186
Annual report 2023, page 1032023 年年报,第 103 页
195,732,840 217,738,416
Annual report 2023, page 1032023 年年报,第 103 页

20242024 年

In 2024, net cash from operating activities was RM11.1 million. Net cash used in investing activities rose to RM49.1 million, including purchase of property, plant and equipment of RM48.1 million. In May 2024 the group bought a 7.9-acre industrial land with a building for RM14.0 million. Financing cash inflows were RM24.7 million net: drawdown of bankers' acceptance of RM762.5 million against repayments of RM738.3 million and proceeds from warrants exercised of RM27.5 million, while dividends paid were RM13.1 million and interest paid was RM9.0 million. Loans and borrowings rose to RM215.7 million.2024 年,营运活动所得现金净额为 RM11.1 million。投资活动所用现金净额增至 RM49.1 million,其中包括购买物业、厂房及设备 RM48.1 million。2024 年 5 月,集团以 RM14.0 million 购入一块连同建筑物的 7.9 英亩工业用地。融资现金净流入为 RM24.7 million:提取银行承兑汇票 RM762.5 million,偿还 RM738.3 million,行使凭单所得 RM27.5 million,而已付股息为 RM13.1 million,已付利息为 RM9.0 million。贷款与借款增至 RM215.7 million。

Sources (10)出处(10)
In May 2024, Southern Cable acquired a 7.9-acre industrial land with an existing building adjacent to our current facilities in Kuala Ketil, Kedah, for RM14.0 million.
Annual report 2024, page 92024 年年报,第 9 页
Purchase of property, plant and equipment (A) (48,063,183) (7,808,334) - -
Annual report 2024, page 1072024 年年报,第 107 页
Net cash (used in)/from investing activities (49,142,165) (8,770,927) 23,300,000 3,200,000
Annual report 2024, page 1072024 年年报,第 107 页
Interest paid (8,959,353) (8,965,789) - -
Annual report 2024, page 1072024 年年报,第 107 页
Dividends paid (13,080,719) (2,240,000) (13,080,719) (2,240,000)
Annual report 2024, page 1072024 年年报,第 107 页
Drawdown of bankers' acceptance 762,509,890 709,237,490 - -
Annual report 2024, page 1072024 年年报,第 107 页
Repayment of bankers' acceptance (738,271,607) (736,019,968) - -
Annual report 2024, page 1072024 年年报,第 107 页
Issuance of shares pursuant to warrants exercised 27,494,747 13,750 27,494,747 13,750
Annual report 2024, page 1072024 年年报,第 107 页
215,707,431 195,732,840
Annual report 2024, page 1242024 年年报,第 124 页
Net cash from/(used in) financing activities 24,711,090 (40,079,236) (13,285,972) (2,226,250)
Annual report 2024, page 1072024 年年报,第 107 页

20252025 年

In 2025, net cash from operating activities was RM10.1 million. Trade and other receivables increased by RM188.3 million. Cash used in investing activities reached RM192.3 million, including RM61.8 million for purchase of property, plant and equipment and RM130.0 million invested in short-term funds. Financing cash inflows totalled RM224.6 million, including RM203.7 million from a private placement of shares, RM34.5 million from warrants exercised, and drawdown of term loans of RM14.6 million, while dividends paid were RM20.4 million and interest paid was RM11.2 million.2025 年,营运活动所得现金净额为 RM10.1 million。应收账款及其他应收款项增加 RM188.3 million。投资活动所用现金达 RM192.3 million,包括购买物业、厂房及设备 RM61.8 million 以及投资于短期基金 RM130.0 million。融资现金流入合计 RM224.6 million,包括私下配售股份所得 RM203.7 million、行使凭单所得 RM34.5 million 和提取定期贷款 RM14.6 million,而已付股息为 RM20.4 million,已付利息为 RM11.2 million。

Sources (11)出处(11)
Trade and other receivables (188,333,205) (50,599,680) 9,081,785 (81,785)
Annual report 2025, page 1082025 年年报,第 108 页
Net cash from/(used in) operating activities 10,077,746 11,049,804 5,158,266 (124,888)
Annual report 2025, page 1082025 年年报,第 108 页
Purchase of property, plant and equipment (61,833,352) (48,063,183) - -
Annual report 2025, page 1092025 年年报,第 109 页
Investment in short-term funds (130,000,000) (774) (100,000,000) -
Annual report 2025, page 1092025 年年报,第 109 页
Net cash (used in)/from investing activities (192,295,580) (49,142,165) (84,500,000) 14,300,000
Annual report 2025, page 1092025 年年报,第 109 页
Interest paid (11,181,870) (8,959,353) - -
Annual report 2025, page 1092025 年年报,第 109 页
Dividends paid (20,436,931) (13,080,719) (20,436,931) (13,080,719)
Annual report 2025, page 1092025 年年报,第 109 页
Drawdown of term loans 14,643,210 - - -
Annual report 2025, page 1092025 年年报,第 109 页
Proceeds from issuance of shares pursuant to warrants exercised 34,536,123 27,494,747 34,536,123 27,494,747
Annual report 2025, page 1092025 年年报,第 109 页
Proceeds from issuance of shares capital via private placement 203,733,215 - 203,733,215 -
Annual report 2025, page 1092025 年年报,第 109 页
Net cash from/(used in) financing activities 224,612,444 24,711,090 78,424,574 (13,285,972)
Annual report 2025, page 1092025 年年报,第 109 页

Across the three years三年合看

Revenue grew from RM875.9 million in 2022 to RM1.05 billion in 2023, RM1.35 billion in 2024, and RM1.76 billion in 2025, while profit for the financial year grew from RM14.5 million to RM29.4 million, RM72.3 million, and RM131.4 million. Annual production capacity for cables and wires expanded from 33,780 km to 40,780 km in 2023, 46,980 km in 2024, and 54,980 km in 2025. Dividends declared surpassed the company policy of distributing at least 15% of annual net profit attributable to shareholders in all three years.营业额从 2022 年的 RM875.9 million 增长至 2023 年的 RM1.05 billion、2024 年的 RM1.35 billion 以及 2025 年的 RM1.76 billion,财政年度盈利从 RM14.5 million 增至 RM29.4 million、RM72.3 million 和 RM131.4 million。电缆与电线年产能从 33,780 km 扩大至 2023 年的 40,780 km、2024 年的 46,980 km 和 2025 年的 54,980 km。三份年报中宣布的股息均超过了向股东派发至少 15% 年度净利润的公司政策。

Sources (6)出处(6)
Southern Cable invested in new machinery to increase the annual cable and wire production capacity by 21% to 40,780 km, from 33,780 km previously, at the manufacturing facility in Kuala Ketil, Kedah.
Annual report 2023, page 92023 年年报,第 9 页
This amounts to a dividend payout of RM6.0 million representing 20.4% of FYE2023 net profit attributable to shareholders, surpassing our policy of distributing at least 15% of the annual net profit attributable to shareholders.
Annual report 2023, page 92023 年年报,第 9 页
This expansion increased the Group’s annual production capacity for cables and wires by 15%, from 40,780 km to 46,980 km.
Annual report 2024, page 92024 年年报,第 9 页
The payout also represents 20% of FYE2024 net profit attributable to shareholders, surpassing our policy of distributing at least 15% of our annual net profit.
Annual report 2024, page 102024 年年报,第 10 页
The dividends declared surpass our policy of distributing at least 15% of annual net profit attributable to shareholders, a benchmark we have consistently outperformed since FYE2023.
Annual report 2025, page 102025 年年报,第 10 页
The investment drove a 17% increase in our production capacity to 54,980 km from 46,980 previously.
Annual report 2025, page 132025 年年报,第 13 页

Still to be spent尚未支出的承诺

Capital commitments contracted for stood at RM13.6 million in 2023, RM28.6 million in 2024, and RM57.6 million in 2025. Of the RM203.7 million raised by private placement in 2025, RM132.7 million was unused at the end of 2025, including RM115.8 million of the RM129.0 million set for capital expenditure and RM16.6 million set for repayment of bank borrowings. A separate RM5.1 million settled the balance for an industrial land acquired in July 2025. At the end of 2024, RM0.6 million of the listing proceeds was unused, with the time to use it extended to 15 October 2025.已签约的资本承诺在 2023 年为 RM13.6 million,2024 年为 RM28.6 million,2025 年为 RM57.6 million。2025 年私下配售筹得的 RM203.7 million 中,截至 2025 年底仍有 RM132.7 million 未动用,包括拨作资本支出的 RM129.0 million 中的 RM115.8 million,以及拨作偿还银行借款的 RM16.6 million。另有 RM5.1 million 用于付清 2025 年 7 月所购工业用地的余款。截至 2024 年底,上市所得款项仍有 RM0.6 million 未动用,动用期限已延至 2025 年 10 月 15 日。

Sources (10)出处(10)
13,554,158 14,549,025
Annual report 2023, page 1232023 年年报,第 123 页
the extension of the timeframe for the utilisation of proceeds raised from the Listing Proceeds for capital expenditure and expansion for another 24 months period until 15 October 2025, allowing the Company to have additional time to utilise the remaining balance of the Listing Proceeds.
Annual report 2024, page 952024 年年报,第 95 页
Total 71,178 - 70,607 571
Annual report 2024, page 952024 年年报,第 95 页
- Purchase of machineries and factory equipment 7,400,000 - 28,648,446 13,554,158
Annual report 2024, page 1432024 年年报,第 143 页
To fund our next phase of growth, we successfully raised RM203.7 million through a private placement exercise in October 2025.
Annual report 2025, page 92025 年年报,第 9 页
Of the remaining placement proceeds, RM5.1 million was utilised to fully settle the balance for an industrial land acquired in July 2025, which serves as the site for the new warehouse.
Annual report 2025, page 132025 年年报,第 13 页
- Purchase of machinery and equipment 83,000 7,902 75,098 Within 24 months 129,000 13,154 115,846
Annual report 2025, page 962025 年年报,第 96 页
Repayment of bank borrowings 16,600 - 16,600 Within 6 months
Annual report 2025, page 962025 年年报,第 96 页
Total 203,730 71,032 132,698
Annual report 2025, page 962025 年年报,第 96 页
57,586,589 28,648,446
Annual report 2025, page 1492025 年年报,第 149 页

Four years of figures四年数字

Group figures, in RM, as printed in the statements.集团数字,单位令吉,照财务报表所印。

Group集团2022202320242025
RM令吉RM令吉RM令吉RM令吉
Revenue营业额875,879,4401,053,081,1001,347,015,8511,759,654,517
Profit before tax税前盈利19,858,68239,048,99692,296,021177,207,171
Profit for the financial year财政年度盈利14,544,37829,436,71372,317,138131,419,177
Net cash from operating activities营运活动所得现金净额(41,305,109)122,986,09711,126,21110,077,746
Purchase of property, plant and equipment购买物业、厂房及设备(12,412,925)(7,808,334)(48,063,183)(61,833,352)
Dividends paid已付股息(1,680,000)(2,240,000)(13,080,719)(20,436,931)
Total assets总资产570,531,992605,582,529721,205,5931,152,784,563
Loans and borrowings贷款与借款217,738,416195,732,840215,707,431235,657,006
Cash and cash equivalents现金及现金等价物21,839,94395,975,87782,671,013123,715,075
Total equity总权益287,831,228315,041,691401,772,857751,024,441

On a computer, hover over a figure for the report and page it is printed on.在电脑上把鼠标移到数字上,可看到它印在哪份年报的哪一页。

Said and done说过的与做到的

What the reports said年报说要做的What later reports show之后年报显示的Status状态
The group expected total annual cable and wire capacity to increase by 15% to 46,980 km by 2025 from 40,780 km, with Lot 38 progressing to machinery installation in the first half of 2024.集团预期到 2025 年电缆与电线总年产能将从 40,780 km 增加 15% 至 46,980 km,Lot 38 厂房在 2024 年上半年进入机械安装阶段。In 2024, operations commenced at the facility on Lot 38, increasing cable and wire annual capacity to 46,980 km.2024 年,Lot 38 厂房投入运作,将电缆与电线年产能提高至 46,980 km。
Sources (4)出处(4)
The structural work for our new cable and wire manufacturing building on Lot 38 has been completed and has progressed to the machinery installation phase in the first half of 2024.
Annual report 2023, page 142023 年年报,第 14 页
Overall, our total annual cable and wire capacity will increase by 15% to 46,980 km by 2025, from 40,780 km previously.
Annual report 2023, page 142023 年年报,第 14 页
In 2024, Southern Cable responded to growing demand by investing in new machinery and commencing operations at our new facility in Kuala Ketil, Kedah on Lot 38.
Annual report 2024, page 92024 年年报,第 9 页
This expansion increased the Group’s annual production capacity for cables and wires by 15%, from 40,780 km to 46,980 km.
Annual report 2024, page 92024 年年报,第 9 页
Carried out in 2024, before the 2025 date said于 2024 年完成,早于所说的 2025 年
A new plastic compounding factory on PT 4845 was targeted to be completed in the second half of 2024, increasing capacity by 54% to 12,000 MT from 7,800 MT.位于 PT 4845 的新塑料混配厂房目标在 2024 年下半年竣工,将年产能从 7,800 MT 提高 54% 至 12,000 MT。The 2024 report says construction was completed, with machinery installation in the first half of 2025 and production in the second half of 2025. The 2025 report says the facility was on track for commissioning in the second quarter of 2026, and that it commenced operations in that quarter.2024 年报称厂房建设已完工,机械安装定于 2025 年上半年,生产定于 2025 年下半年。2025 年报称该设施有望于 2026 年第二季度投产,并称已于该季度开始运作。
Sources (6)出处(6)
We are also expecting our plastic compounding factory on PT 4845 to begin construction work in the first half of 2024, providing us with an additional 4,200 MT of annual capacity.
Annual report 2023, page 142023 年年报,第 14 页
This new factory is targeted to be completed in the second half of 2024 and will increase our annual plastic compounding capacity by 54% to 12,000 MT, from 7,800 MT currently.
Annual report 2023, page 142023 年年报,第 14 页
Meanwhile, the construction of our new plastic compound facility is completed, and machinery installations are scheduled for the first half of 2025.
Annual report 2024, page 152024 年年报,第 15 页
Following the completion of installations and successful trial runs, production at the new facility will commence in the second half of 2025.
Annual report 2024, page 152024 年年报,第 15 页
As part of our ongoing expansions, we commenced operations of a new aluminium furnace and plastic compounding facility in the second quarter of 2026.
Annual report 2025, page 92025 年年报,第 9 页
Furthermore, a new plastic compounding facility is on track for commissioning in the second quarter of 2026, increasing our annual compounding capacity by 54% to 12,000 MT, up from 7,800 MT.
Annual report 2025, page 162025 年年报,第 16 页
Building completed in 2024; operations later than said, in the second quarter of 2026厂房于 2024 年完工;运作晚于所说,在 2026 年第二季度
The group planned to partially commence operations on the 7.9-acre land in 2025 to increase annual capacity by 5,000 km, bringing total capacity to 51,980 km by the second half of 2025.集团计划在 2025 年让 7.9 英亩用地部分投入运作,增加年产能 5,000 km,使 2025 年下半年总年产能达到 51,980 km。The 2025 report says RM36.0 million of capital expenditure to upgrade low-voltage and medium-voltage production lines raised capacity by 17% to 54,980 km. It does not say whether operations began on the 7.9-acre land.2025 年报称,用于提升低压和中压生产线的 RM36.0 million 资本支出使产能增加 17% 至 54,980 km。年报未说明 7.9 英亩用地是否已开始运作。
Sources (4)出处(4)
Additionally, as part of our ongoing expansion, we plan to invest in new machinery and upgrades at our existing facilities, as well as to partially commence operations on the 7.9-acre land in 2025 to increase our annual capacity by 5,000 km at Southern Cable’s facilities in Kuala Ketil, Kedah.
Annual report 2024, page 152024 年年报,第 15 页
The expansion will bring our total annual capacity to 51,980 km by the second half of 2025, up from 46,980 km as at 31 December 2024.
Annual report 2024, page 152024 年年报,第 15 页
To fulfil our record orders, the Group invested RM36.0 million in capital expenditure during the year to upgrade our low-voltage and medium-voltage production lines.
Annual report 2025, page 132025 年年报,第 13 页
The investment drove a 17% increase in our production capacity to 54,980 km from 46,980 previously.
Annual report 2025, page 132025 年年报,第 13 页
Capacity above the figure said; the land not reported on产能高于所说数字;该用地情况未有报告
After securing UL Standard certification for USE-2 aluminium building wire in December 2024, the group aimed to begin shipments to the US in the first half of 2025.在 2024 年 12 月获得 USE-2 铝制建筑电线的 UL 标准认证后,集团目标在 2025 年上半年开始向美国发货。The 2025 report says the USE-2 wire was commercialised in the second half of 2025. Sales to a US customer were over RM160 million, up from RM40 million the year before.2025 年报称 USE-2 电线于 2025 年下半年实现商业化。对一名美国客户的销售额超过 RM160 million,上一年为 RM40 million。
Sources (3)出处(3)
In December 2024, we secured a new UL Standard certification for the USE-2 aluminium building wire, and we aim to begin shipments to the US in the first half of 2025.
Annual report 2024, page 132024 年年报,第 13 页
Driven by sustained demand for our XHHW-2 (1kV) wire and the successful commercialisation of our USE-2 (600V) wire in the second half of the year, export volumes surged fourfold.
Annual report 2025, page 132025 年年报,第 13 页
The higher exports translated to over RM160 million in sales to a US customer, up from the RM40 million recorded in the previous year.
Annual report 2025, page 132025 年年报,第 13 页
Later than said: second half of 2025晚于所说:2025 年下半年
The group planned to invest more than RM30 million on a 5.4-acre land to construct two new production facilities, with construction scheduled to begin in 2025 and completion targeted for 2026.集团计划在 5.4 英亩土地上投资超过 RM30 million 建设两座新生产厂房,建设定于 2025 年开工,目标于 2026 年完工。The 2025 report says construction of a new facility for low-voltage cables and wires is targeted for completion in the second half of 2026, with operations expected in the first half of 2027.2025 年报称,用于低压电缆和电线的新厂房目标于 2026 年下半年完工,预计 2027 年上半年投入运作。
Sources (4)出处(4)
Together with our existing 5.4-acre land, adjacent to the new industrial site, we plan to invest more than RM30 million to construct two new production facilities.
Annual report 2024, page 152024 年年报,第 15 页
Construction work is scheduled to begin in 2025, with completion targeted for 2026.
Annual report 2024, page 152024 年年报,第 15 页
Construction of a new facility for low-voltage cables and wires is targeted for completion in the second half of 2026.
Annual report 2025, page 162025 年年报,第 16 页
Machinery installation is scheduled to occur in tandem, and we expect the new facility to be operational in the first half of 2027.
Annual report 2025, page 162025 年年报,第 16 页
Still in progress仍在进行中

What the reports leave open年报留下待看的事

  • Orders in hand stood at RM765.6 million as at 31 December 2025, and a TNB contract was expanded by a RM121.1 million variation order in February 2026, raising the total TNB contract value to RM524.6 million.截至 2025 年 12 月 31 日手头订单为 RM765.6 million,2026 年 2 月国家能源合同通过 RM121.1 million 的变更指令扩大,将国家能源总合同额提高至 RM524.6 million。
    Sources (3)出处(3)
    The Group closed the year with orders in hand of RM765.6 million as at 31 December 2025, comprising RM380.8 million from long-term contracts and RM384.8 million from purchase orders, with power cables representing the majority share.
    Annual report 2025, page 132025 年年报,第 13 页
    Since year-end, our pipeline was further strengthened when the TNB contract was expanded via a RM121.1 million variation order in February 2026.
    Annual report 2025, page 132025 年年报,第 13 页
    The award raises the total TNB contract value to RM524.6 million, securing earnings visibility into FYE2027.
    Annual report 2025, page 132025 年年报,第 13 页
  • Trade receivables rose to RM456.4 million at end 2025 (RM301.2 million in 2024), with RM71.3 million more than 120 days past due (RM21.7 million in 2024) and RM82.1 million past due 91 to 120 days. Five customers accounted for 33% of receivables.2025 年底应收账款升至 RM456.4 million(2024 年为 RM301.2 million),其中逾期超过 120 天为 RM71.3 million(2024 年为 RM21.7 million),逾期 91 至 120 天为 RM82.1 million。5 名客户占应收账款的 33%。
    Sources (4)出处(4)
    Trade receivables (b) 456,386,115 301,204,527 - -
    Annual report 2025, page 1232025 年年报,第 123 页
    As at the end of the reporting period the Group has significant concentration of credit risk in the form of outstanding balances owing by 5 (2024:1) customers representing 33% (2024: 17%) of the total receivables.
    Annual report 2025, page 1402025 年年报,第 140 页
    91 to 120 days past due 82,059,762 2,855,385
    Annual report 2025, page 1412025 年年报,第 141 页
    More than 120 days past due 71,282,803 21,687,022
    Annual report 2025, page 1412025 年年报,第 141 页
  • Of the RM203.7 million raised by private placement, RM132.7 million was still unused at the end of 2025, including RM115.8 million set for capital expenditure.私下配售筹得的 RM203.7 million 中,截至 2025 年底仍有 RM132.7 million 未动用,其中 RM115.8 million 拨作资本支出。
    Sources (3)出处(3)
    To fund our next phase of growth, we successfully raised RM203.7 million through a private placement exercise in October 2025.
    Annual report 2025, page 92025 年年报,第 9 页
    - Purchase of machinery and equipment 83,000 7,902 75,098 Within 24 months 129,000 13,154 115,846
    Annual report 2025, page 962025 年年报,第 96 页
    Total 203,730 71,032 132,698
    Annual report 2025, page 962025 年年报,第 96 页
  • The group targets annual cable and wire capacity of 65,000 km by the end of 2027, up from 54,980 km at end-2025, alongside an increase in aluminium rod capacity from 20,000 MT to over 60,000 MT.集团目标到 2027 年底电缆与电线年产能达到 65,000 km(2025 年底为 54,980 km),同时铝杆年产能从 20,000 MT 增至超过 60,000 MT。
    Sources (2)出处(2)
    The new furnace triples our annual aluminium rod capacity from 20,000 MT to over 60,000 MT, insulating our operations from supply fluctuations while optimising cost efficiency.
    Annual report 2025, page 162025 年年报,第 16 页
    We are targeting a total annual capacity of 65,000 km by the end of 2027, up from 54,980 km as at end-2025.
    Annual report 2025, page 162025 年年报,第 16 页

Facts as printed in the company's annual reports, with the page of each; no rating and no advice. Built 2026-10-16.内容为公司年报所印的事实,并注明页码;不评级,不构成投资建议。生成日期 2026-10-16。